DataMan · Datacentres & infrastructure

Plan a site change from the rack to the application. We map power, connectivity, compute and storage dependencies before equipment or workloads move.
Engineering services
Infrastructure discovery
Trace the physical connections and logical dependencies behind each production service. Record ownership, single points of failure and the systems that must come back first.
Datacentre moves
Translate the dependency map into move groups. Plan rack placement, connectivity checks and a decision point for each group before the next one moves.
Operational handover
Agree acceptance checks with the people taking over the site. Exercise service start-up and monitoring and record what the operators need during an incident.
Platforms & tooling
- Linux and FreeBSD — operating-system configuration and service dependencies.
- Ansible — repeatable host configuration.
- Icinga — availability and dependency checks.
Typical deliverables
An asset and dependency map, a migration sequence, acceptance checks and an operations handover.
