TLA IT Solutions — Bred to Lead

Two-office recovery design

The assignment

An organisation operating from two offices needed shared data at both locations and a plan for recovering services after disruption.

Engineering role

The engineer designed and implemented a Unix storage and backup cluster and bidirectional data synchronisation between offices, and developed the disaster recovery plan.

Design considerations

Synchronisation can propagate a deletion to both offices. A recovery plan should identify the trusted copy, the backup recovery point and when synchronisation may safely resume.